2020-885-000-B-0

FARAH DIANA
1029 STEEL CT

Milton 32583

Parcel #: 231S28000300A000080

Residential Project ACTIVE
NEW - FOUNDATION ONLY
1029 STEEL CT

Issued:
02/04/2020
Tech:
(105)
Status:
INACTIVE
Occupancy Type:
Single Family Detached
Structure Type:
V-B
Roof Type:
COUNTY PAVED
Sewer or Septic:
SEW
Driveway:
NEW
Water:
BAGADAD
End Drive:
FLAT
Driveway Location:
FRONT-CENTER
Corner Lot:
1
Replacement?:
No
Length:
64.0
Width:
42.0
Front Setback:
25.0
Back Setback:
25.0
Right Setback:
10.0
Left Setback:
6.0
Flood Zone Code:
X
Flood Zone
Area of Minimal Flooding
Fee: $124.00     Bal: $0.00
Receipt #Payment
2722$124.00
InspReq Date | TimeInsp DateResultInsp ID
FOT 02/14/2020 | 09:56:00 02/17/2020 257 15
FOT 02/18/2020 | 14:20:00 02/18/2020 PAS 15
2020-885  
  Permit # Permit Type Status
  2020-885-000-B-0 NEW FOUNDATION ONLY INACTIVE
  2020-885-000-B-1 NEW RESIDENTIAL STRUCTURE ACTIVE
  2020-885-000-B-2 INSTALL ROOFING ACTIVE
  2020-885-000-B-9 NEW SITE ACTIVE
  2020-885-000-E-0 NEW RESIDENCE INACTIVE
  2020-885-000-E-1 NEW RESIDENCE ACTIVE
  2020-885-000-E-2 NEW TEMPORARY POWER PERMIT FINALED
  2020-885-000-E-9 NEW TEMPORARY SERVICE POLE PERMIT FINALED
  2020-885-000-M-0 NEW RESIDENCE ACTIVE
  2020-885-000-P-0 NEW RESIDENCE ACTIVE
2020-885
  2020-885-000
  Permit # Issue Date Permit Type Status
  2020-885-000-A-0 01/29/2020
  2020-885-000-B-0 02/04/2020 NEW FOUNDATION ONLY INACTIVE
  2020-885-000-B-1 03/05/2020 NEW RESIDENTIAL STRUCTURE ACTIVE
  2020-885-000-B-2 09/11/2020 INSTALL ROOFING ACTIVE
  2020-885-000-B-9 01/30/2020 NEW SITE ACTIVE
  2020-885-000-E-0 09/29/2020 NEW RESIDENCE INACTIVE
  2020-885-000-E-1 01/20/2021 NEW RESIDENCE ACTIVE
  2020-885-000-E-2 04/06/2021 NEW TEMPORARY POWER PERMIT FINALED
  2020-885-000-E-9 06/23/2020 NEW TEMPORARY SERVICE POLE PERMIT FINALED
  2020-885-000-M-0 11/19/2020 NEW RESIDENCE ACTIVE
  2020-885-000-P-0 03/06/2020 NEW RESIDENCE ACTIVE